Dry cooling, full turnkey — design to commissioning.
) (cps, with our alliance partners, undertakes the complete delivery of industrial air cooled condensers (ACCs) — covering design, manufacture, supply, construction and commissioning.
Air cooled condensers use forced air across finned tube heat exchanger bundles to reject heat with zero water consumption. No cooling tower, no water treatment programme, no visible plume — and no Legionella risk from the cooling system. For sites where water scarcity, environmental permitting or planning sensitivity rule out evaporative cooling, an ACC is not a compromise: it is the right engineering answer.
Our role is to bring the right partner capability together for each project, providing the independent technical interface between operator and supply chain across the full delivery lifecycle.